I think, while things are rough right now, Universal really isn't going to analyze capacity needs until all rides are working at at least 80%. Right now, everyday, there are numerous downtimes, and several rides are sometimes running at a reduced capacity. Stardust running one track, Hiccups using only 1 load platform. Ministry is still not up to what is planned. I think Universal will wait until the park is running solidly too analyze capacity needs. Until then they will address other complaints like shade